High Plains Technology Center
Woodward, OK
Install new cooling tower, plate and frame heat exchanger, pumps and associated piping.
Danforth Senior Center
Oklahoma City, OK
Replace two 80 ton chillers, heat exchanger, 9 air handling units, fan coil units, pumps and controls.
Bank One Building
Edmond, OK
Install new rooftop package units, ductwork, grilles and plumbing.
OSBI
Oklahoma City, OK
Replace two 70 ton chillers, two pumps and install a Trane Tracer Summit Control system.
Weatherford Middle School
Weatherford, OK
Install new rooftop units, air handling units, ductwork and modify plumbing system.
Putnam City High School
Oklahoma City, OK
Replace the existing equipment with a new chiller, cooling tower and boilers. The chiller and boilers will be installed in a new metal building in the courtyard.
Pauls Valley Middle School
Pauls Valley, OK
Crystal Park Medical Office Building
Oklahoma City, OK
Install new geothermal heat pumps , ductwork, and energy recovery unit.
Altus AFB Building 170
Altus, OK
Replace air handling unit, boiler, pump, install new supply and return grilles, modify existing ductwork and retrofit pluming piping and fixtures in two restrooms. HVAC system designed by Hunter Mechanical.
Reding Senior Center
Oklahoma City, OK
One hundred apartments and a club house with geothermal heat pumps . Each apartment is served by an indivdual geothermal wellfield.
Ft Sill Apartments
Ft Sill, OK
Demo exiting boilers, chillers, pumps and fan coil units. Install 30 new geothermal heat pumps in each appartment - one wellfield to serve each building. Install geothermal heat exchanger to provide "free" domestic hot water. HVAC system designed by Hunter Mechanical.
High Pointe Psychiatric Center
Oklahoma City, OK
Patient housing and offices served by geothermal heat pumps connected to a single geothermal wellfield.
|